Installation Project – Open Pit Offices
Location:
Telfer, Pilbara Region of Western Australia
Duration:
July 2018 – Present
Summary:
Supply, install, refurbishment and commission of 16 floor building split off from the original 24 floor building. The building has been re-configured and engineered to suit the clients requirements to house multiple offices , locker room, training room, communication room , ice room, 30 man Crib room and toilets to service the in pit personnel.
Background Information:
The Building was procured at auction by CDC from the Wheatstone project to re- purpose as the dedicated in pit offices for operation at Telfer mine site.